Check out these projects too
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a compressed air collector in galvanized steel.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Realization of a fully finished washing room with sliding panel at the front.
- Construction of a preparation room with a structure providing access to the roof.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of stainless steel piping with fully controlled valves.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of internal walls to create separate office spaces.
- Construction of a platform to support a heat curtain and drying unit.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of automatic valves that open and close during the filling process.
- Realization of a platform that was suspended from an existing structure.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of a spiral duct for extraction via the roof.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Construction of a custom-made machine platform for maintenance access at a French production site.